DEVELOPMENT and IMPLEMENTATION of RENEWABLE ENERGY PROJECTS in Romania

www.RomProiect.com

Versiune in Limba Romana - BINE ATI VENIT la Compania ENERGO EOLIAN ROMPROIECT din Romania - INTRA Versiune in Limba Romana

GREEN ENERGY

WIND ENERGY & SOLAR ENERGY

CLEAN ENERGY

ENERGO EOLIAN ROMPROIECT from Romania - Wind Parks, Wind Turbines, Wind Power Plants, Wind Assessment Campaign, Full Services

ENTER - WELLCOME to ENERGO EOLIAN ROMPROIECT Company from Romania

ENERGO EOLIAN ROMPROIECT - Development and Implementation of Renewable Energy Projects in Romania with FULL SERVICES

Wind 
      
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                             
  
  
  
  
  
  
  
  
  
  Energy  -  Renewable  Energy  -  Green  Energy  -  Clean  Energy  by  ENERGO  EOLIAN  ROMPROIECT  from  Romania

Recommended Options

Wellcome to Renewable Energy Domain!

Related Links

Home

About Us

Services

Products

Professional Wind Assessment System MEGA 80HD Stainless Steel [80 meters]

Professional Wind Assessment System MEGA 80HD Galvanized [80 meters]

Professional Wind Assessment System SCOUT 60 [60 meters]

Professional Wind Assessment System SCOUT 60UP [60 meters]

Professional Wind Assessment System SCOUT 50 [50 meters]

Professional Wind Assessment System SCOUT 50UP [50 meters]

Recommended Options for Professional Wind Assessment Systems

Wind Turbines

Solar Systems

E.E.R. Partners

About Wind Monitoring

Related Links

About Renewable Energy in Romania

News

Site Map

CONTACT FORM

1. PROFESSIONAL GINPOLE KIT

   The most efficient and easy way to install a tilt-up tower !

   The PROFESSIONAL GINPOLE KIT is a unique installation system that can be used for 40 - 50 - 60 - 67 and 80 meters tower. This revolutionary method was design by AAT installation and engineering team in order to facilitate the erection process of a tilt-up tower and to be more secure. This system is a quality tool for professional installer. It is stronger and safer than the competition's installation kit. The side winch assemblies allow for quicker installation, a great asset for professionals that have a large number of tower to install in a short period of time.

   With this complete toolkit, the side guy wires tension can be quickly adjusted with the side hand winches. No more need to loosen and tighten the u-bolts every time you want to adjust the guy wires tension. This represent an important time and energy saver. You would not be slowed by high grade site.

   The AAT Professional Ginpole Kit is the only one to offer the possibility to adjust the tower curvature throughout the raise of the tower as the lifter guy wires are reported to the winches at the base of the gin pole (patent pending). This method has simplified the erection of tilt-up towers. Final adjustment of tower straightness is done with the use of the winches which is quicker and easier.

   This ginpole is designed to increase the security of personal and is a reusable item.

Price : 7.500 USD *

* Price without taxes and VAT

2. AAT AERIAL OBSTRUCTION LIGHT KIT SOLAR POWERED

   When aerial obstruction lighting is required, this kit is ideal for remote areas since it can operate on batteries and solar panels. With two lighting levels (mid and top of tower) and a nominal 2000 candles flashing light at the top, this kit answer your lighting issues.
   This easy to install kit contain a top flashing red light and middle steady red lights installed on the opposite side of the tower. This low power consommation light kit (12 Watts) is supplied by two 12V sealed gel batteries recharged by two 130W Kyocera solar panels and a battery charge controller.

   GENERAL DESCRIPTION

  • Top Flashing Red light (1 second ON, one second OFF)
  • Mid Steady Red lights (2) installed on opposite side of tower
  • Mounting bracket for 6” tube tower included
  • Cable and NEMA 4X plug for wet location included
  • Low power consumption : 12 Watts
  • Directional solar support tilt angles (0 to 90°)
  • NEMA4X enclosure for power supply with lock system
  • Easy to install

   LIGHTNING

  • Description : Top Flashing Red light (1 second ON, one second OFF) - Mid Steady Red lights (2) installed on opposite side of tower
  • Light Cap : Red diffuser light Cap (suitable for wet location)
  • Light Intensity : Tower top lighting is 2000 candles - Tower mid lighting is 200 cd each
  • LED light source : LED assembly, 100 000h operation,200 cd at 0.1A and 2000 cd at 1A
  • Consommation : 12Watts (Average) on 12V

   POWER SUPPLY

  • Storage : 12 V -(100AH each) Valve regulated lead-acid (2 per kit)
  • Solar panel : Kyocera 260W with directional tilt angles support 0 to 90°
  • Solar regulator : Temperature compensation and digital meter
  • Note : The power source may need to be changed for high latitudes

   CABINET

  • Enclosure : Steel NEMA 4X, 20X20X8 inches with lock system

   OPERATING CONDITIONS

  • Operating temperature : -40°C a 65°C
  • Humidity : 0-100% non condensing

Price : 6.900 USD *

* Price without taxes and VAT

3. AAT OBSTRUCTION COLOR MARKING FOR MEGA 80HD

   When obstruction color marking is required, this is the option you need. The tower is colored using resistant vinyl tape, with white and international orange band. This marking process assures a long life, and eliminates all outdoor paint color deterioration due to scaling, sunlight, oxidation or chipping. This option answers your marking issues.

   GENERAL DESCRIPTION

  • Alternate bands of white and international orange;
  • Band width: 1/7 of tower heights;
  • Bands color evenly distributed;
  • Perpendicular to the vertical axis with orange bands at the top and bottom of tower;

   This marking option is only sold for AAT towers.

Price : 1.345 USD *

* Price without taxes and VAT

4. AAT OBSTRUCTION COLOR MARKING FOR SCOUT 60

   When obstruction color marking is required, this is the option you need. The tower is colored using resistant vinyl tape, with white and international orange band. This marking process assures a long life, and eliminates all outdoor paint color deterioration due to scaling, sunlight, oxidation or chipping. This option answers your marking issues.

   GENERAL DESCRIPTION

  • Alternate bands of white and international orange;
  • Band width: 1/7 of tower heights;
  • Bands color evenly distributed;
  • Perpendicular to the vertical axis with orange bands at the top and bottom of tower;

   This marking option is only sold for AAT towers

Price : 1.009 USD *

* Price without taxes and VAT

5. AAT OBSTRUCTION COLOR MARKING FOR SCOUT 50

   When obstruction color marking is required, this is the option you need. The tower is colored using resistant vinyl tape, with white and international orange band. This marking process assures a long life, and eliminates all outdoor paint color deterioration due to scaling, sunlight, oxidation or chipping. This option answers your marking issues.

   GENERAL DESCRIPTION

  • Alternate bands of white and international orange;
  • Band width: 1/7 of tower heights;
  • Bands color evenly distributed;
  • Perpendicular to the vertical axis with orange bands at the top and bottom of tower;

   This marking option is only sold for AAT towers

Price : 841 USD *

* Price without taxes and VAT

Certification & Recognition

General Developer of Renewable Energy
E.E.R. - Romania Fax: (+4) 031.800.47.45 or CONTACT FORM

Site Map

 

 


Copyright © 2006 - 2008 * ENERGO EOLIAN ROMPROIECT * Romania * All rights reserved